----------------------------------------------------------- Minutes of the joint ABP-LOC/RLC team meeting of 24.05.2005 web site: http://ab-abp-rlc.web.cern.ch/ab-abp-rlc/ Extracted from the LOC summary ------------------------------------------------------------ (1) Preparation and status of beam-beam tracking (WH,DK) -------------------------------------------------------- Preparation of the beam-beam simulation campaign is over. This required: Development of a new environment/scripts to perform tune scans Development of the tool to submit the jobs to CPSS and BOINC Modifications in MADX It was suggested to improve the CPU-time requirements for tune-scans by performing short-term runs to rule out bad tunes. Not performing a grid scan, but rather a sort of guided search (simplex method, simulated annealing, etc.) to find the best tune. It is suggested to perform a scan over the phase advance between the insertions.